{"id":2094,"date":"2023-08-31T12:27:24","date_gmt":"2023-08-31T10:27:24","guid":{"rendered":"https:\/\/nuovo.hi-pe.it\/non-categorizzato\/acquisition-of-a-new-major-contract-for-hi-pe-from-siemens-energy\/"},"modified":"2023-08-31T12:27:24","modified_gmt":"2023-08-31T10:27:24","slug":"acquisition-of-a-new-major-contract-for-hi-pe-from-siemens-energy","status":"publish","type":"post","link":"https:\/\/nuovo.hi-pe.it\/en\/high-voltage\/acquisition-of-a-new-major-contract-for-hi-pe-from-siemens-energy\/","title":{"rendered":"Acquisition of a New Major Contract for HI-PE from Siemens Energy"},"content":{"rendered":"<p>The contract involves the modification and <strong>completion of two 420 kV GIS columns<\/strong> as part of an upgrade project for a <strong>major high-voltage primary substation<\/strong>.<\/p>\n<p>This strategic project, which involves the <strong>Northern Italy power grid<\/strong>, represents a challenge that HI-PE is ready to tackle with professionalism and excellence, continuing to provide solutions to meet the growing demands for <strong>reliability <\/strong>and <strong>flexibility <\/strong>in the energy sector.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter wp-image-186 size-full\" style=\"margin-top: 30px;\" src=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2023\/09\/commessa-siemens-energy.jpg\" alt=\"\" width=\"1200\" height=\"800\" srcset=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2023\/09\/commessa-siemens-energy.jpg 1200w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2023\/09\/commessa-siemens-energy-300x200.jpg 300w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2023\/09\/commessa-siemens-energy-1024x683.jpg 1024w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2023\/09\/commessa-siemens-energy-768x512.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The contract involves the modification and completion of two 420 kV GIS columns as part of an upgrade project for a major high-voltage primary substation. This strategic project, which involves the Northern Italy power grid, represents a challenge that HI-PE is ready to tackle with professionalism and excellence, continuing to provide solutions to meet the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1448,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[],"class_list":["post-2094","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-high-voltage"],"_links":{"self":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/posts\/2094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/comments?post=2094"}],"version-history":[{"count":0,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/posts\/2094\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/media\/1448"}],"wp:attachment":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/media?parent=2094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/categories?post=2094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/tags?post=2094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}