{"id":2080,"date":"2024-07-26T16:25:11","date_gmt":"2024-07-26T14:25:11","guid":{"rendered":"https:\/\/nuovo.hi-pe.it\/non-categorizzato\/another-success-for-hi-pe-construction-of-a-waste-heat-boiler-unit-for-john-zink-hamworthy-combustion-completed\/"},"modified":"2024-07-26T16:25:11","modified_gmt":"2024-07-26T14:25:11","slug":"another-success-for-hi-pe-construction-of-a-waste-heat-boiler-unit-for-john-zink-hamworthy-combustion-completed","status":"publish","type":"post","link":"https:\/\/nuovo.hi-pe.it\/en\/furnaces-and-boilers\/another-success-for-hi-pe-construction-of-a-waste-heat-boiler-unit-for-john-zink-hamworthy-combustion-completed\/","title":{"rendered":"Another Success for Hi-Pe: Construction of a Waste Heat Boiler Unit for John Zink Hamworthy Combustion Completed"},"content":{"rendered":"<p>The last two components of the <strong>Waste Heat Boiler Unit<\/strong> built for <strong>John Zink Hamworthy Combustion<\/strong>, part of the <strong>Koch Group<\/strong>, leave HI-PE\u2019s plant towards the <strong>MOL Danube Refinery<\/strong> in <strong>Hungary<\/strong>.<\/p>\n<p>The project \u2013 concerning the supply and construction of a unit with combustion gas preheating with OFF GAS \/ FLUE GAS and OFF GAS \/ Steam exchanger, capable of producing 39 Ton\/h of superheated steam at 14.5 barg and 385\u00b0 C \u2013 was thus concluded <strong>in compliance with the contractual commitments<\/strong> made and with <strong>full customer satisfaction<\/strong>.<\/p>\n<p>HI-PE S.r.l. is proud to announce the excellent result achieved.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-1838 size-full\" src=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/11\/IMG_5063.jpg\" alt=\"\" width=\"576\" height=\"768\" srcset=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/11\/IMG_5063.jpg 576w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/11\/IMG_5063-225x300.jpg 225w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-1834 size-full\" src=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/11\/hi-pe.jpg\" alt=\"\" width=\"1600\" height=\"720\" srcset=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/11\/hi-pe.jpg 1600w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/11\/hi-pe-300x135.jpg 300w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/11\/hi-pe-1024x461.jpg 1024w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/11\/hi-pe-768x346.jpg 768w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/11\/hi-pe-1536x691.jpg 1536w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The last two components of the Waste Heat Boiler Unit built for John Zink Hamworthy Combustion, part of the Koch Group, leave HI-PE\u2019s plant towards the MOL Danube Refinery in Hungary. The project \u2013 concerning the supply and construction of a unit with combustion gas preheating with OFF GAS \/ FLUE GAS and OFF GAS [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1837,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-2080","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-furnaces-and-boilers"],"_links":{"self":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/posts\/2080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/comments?post=2080"}],"version-history":[{"count":0,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/posts\/2080\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/media\/1837"}],"wp:attachment":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/media?parent=2080"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/categories?post=2080"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/tags?post=2080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}