{"id":2079,"date":"2024-08-05T16:18:47","date_gmt":"2024-08-05T14:18:47","guid":{"rendered":"https:\/\/nuovo.hi-pe.it\/non-categorizzato\/sonatrachs-three-desalination-unit-effects-are-being-completed\/"},"modified":"2024-08-05T16:18:47","modified_gmt":"2024-08-05T14:18:47","slug":"sonatrachs-three-desalination-unit-effects-are-being-completed","status":"publish","type":"post","link":"https:\/\/nuovo.hi-pe.it\/en\/desalination\/sonatrachs-three-desalination-unit-effects-are-being-completed\/","title":{"rendered":"Sonatrach\u2019s Three Desalination Unit Effects Are Being Completed"},"content":{"rendered":"<p>Work is ongoing for the supply of the <strong>desalator <\/strong>commissioned by the <strong>Algerian company<\/strong> <strong>Sonatrach <\/strong>to the <strong>Demont Group<\/strong> last February. The order is for a 20 tonne\/hour distilled water desalination unit, directed to the GPZ1 complex in Oran.<\/p>\n<p>At the current stage of the project, the<strong> three \u201ceffects\u201d<\/strong> that will form the <strong>evaporator <\/strong>(main component of the desalination unit) are being completed within HI-PE\u2019s workshops, ready for the upcoming pickling process and for subsequent assembly.<\/p>\n<p><strong>Demont and HI-PE<\/strong>, joining forces in the fields of <strong>design<\/strong>, <strong>engineering <\/strong>and <strong>construction<\/strong>, will be ready to send to Sonatrach the complete desalination unit of all its components by the end of the year, whose final assembly will take place once arrived in the Algerian territory.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter wp-image-1828 size-large\" src=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Primoeffetto2-1024x1024.jpg\" alt=\"\" width=\"800\" height=\"800\" srcset=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Primoeffetto2-1024x1024.jpg 1024w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Primoeffetto2-300x300.jpg 300w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Primoeffetto2-150x150.jpg 150w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Primoeffetto2-768x768.jpg 768w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Primoeffetto2-1536x1536.jpg 1536w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Primoeffetto2-2048x2048.jpg 2048w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>          <img decoding=\"async\" class=\"aligncenter wp-image-1825 size-large\" src=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Terzo-effetto2-1024x1024.jpg\" alt=\"\" width=\"800\" height=\"800\" srcset=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Terzo-effetto2-1024x1024.jpg 1024w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Terzo-effetto2-300x300.jpg 300w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Terzo-effetto2-150x150.jpg 150w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Terzo-effetto2-768x768.jpg 768w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Terzo-effetto2-1536x1536.jpg 1536w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Terzo-effetto2-2048x2048.jpg 2048w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p><img decoding=\"async\" class=\"aligncenter wp-image-1830 size-large\" src=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Secondo-effetto-1024x768.jpg\" alt=\"\" width=\"800\" height=\"600\" srcset=\"https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Secondo-effetto-1024x768.jpg 1024w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Secondo-effetto-300x225.jpg 300w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Secondo-effetto-768x576.jpg 768w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Secondo-effetto-1536x1152.jpg 1536w, https:\/\/nuovo.hi-pe.it\/wp-content\/uploads\/2024\/08\/Secondo-effetto.jpg 2000w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work is ongoing for the supply of the desalator commissioned by the Algerian company Sonatrach to the Demont Group last February. The order is for a 20 tonne\/hour distilled water desalination unit, directed to the GPZ1 complex in Oran. At the current stage of the project, the three \u201ceffects\u201d that will form the evaporator (main [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1826,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-2079","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-desalination"],"_links":{"self":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/posts\/2079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/comments?post=2079"}],"version-history":[{"count":0,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/posts\/2079\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/media\/1826"}],"wp:attachment":[{"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/media?parent=2079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/categories?post=2079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuovo.hi-pe.it\/en\/wp-json\/wp\/v2\/tags?post=2079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}